Burnaby capacity planning

Confirm the Load Before Choosing an Upgrade

Start with planned loads and safe existing-system evidence, then compare panel, service and load-management paths with their approval dependencies.

Capacity board

Trace the decision from load to approval

Each circuit on this board is a dependency, not a shortcut to an upgrade.

LOAD

Inventory present and future equipment using safe records and qualified calculation.

PATH

Compare panel, service and management options against verified system evidence.

AUTH

Assign contractor verification, permit, inspection, utility and building decisions.

Choose the next decision

One property. Six distinct questions.

Start with the page that matches the uncertainty you need to resolve—not a preset solution.

Decision file

Build a clearer project record

01

Set the project goal

List EV charging, heat pump, suite, hot tub, appliance or equipment plans plus any inspection concern and sequencing.

02

Use safe existing evidence

Gather utility records, past permits, panel schedules and visible labels without opening covers or judging condition.

03

Separate spaces, rating and supply

Panel spaces, panel rating and available service capacity are different questions that require assessment and load evidence.

04

Map the approval chain

Connect qualified contractor verification, permit and inspection, BC Hydro service steps, City or building interfaces and strata decisions.

Primary references

Verify current rules at the source

Links checked in the approved research packet on August 26, 2026. Applicability still depends on the property and proposed scope.